WNE ENERGY

Flagship Energy Storage Projects

Industrial parks and fishery-solar hybrid cases in Guangdong and Guangxi

Huizhou Desheng | 0.5MW / 1.04MWh

PROJECT 01

Huizhou Desheng | 0.5MW / 1.04MWh

Industrial storage providing peak-valley arbitrage, dynamic capacity support and backup for critical loads.

Get Similar Solution
Dongguan Humen Xinhuihong | 0.44MW / 0.932MWh

PROJECT 02

Dongguan Humen Xinhuihong | 0.44MW / 0.932MWh

Distributed park storage that reduces peak electricity costs and supports uninterrupted production.

Get Similar Solution
Guangzhou Huadu Industrial Park | 7.33MWh

PROJECT 03

Guangzhou Huadu Industrial Park | 7.33MWh

Multi-model storage deployed across five locations in a constrained existing industrial park.

Get Similar Solution
Guangxi Dongxing | 20MW / 40MWh

PROJECT 04

Guangxi Dongxing | 20MW / 40MWh

Fishery-solar hybrid storage designed for a high-salt coastal environment with enhanced corrosion protection.

Get Similar Solution

WNE ENERGY

Online Consultation Form

Tell us about your project. A business specialist will respond within 1–2 business days.